# Going-to-the-Sun Road — Glacier National Park’s mountain road, and when it opens over Logan Pass Canonical: https://sockmonkey.com/places/going-to-the-sun-road (this is a plain-text copy of that page) Source: https://sockmonkey.com/places/going-to-the-sun-road Publisher: SockMonkey.com (https://sockmonkey.com) Part of: The Field Guide - https://sockmonkey.com/places/ Cite as: SockMonkey.com - sockmonkey.com Last reviewed: 21 October 2026 - **Where:** North-west Montana, United States - **Start / end:** West Glacier (Apgar) to St. Mary - **Length:** 50 mi (NPS directions page); see the field notes - **Highest point:** Logan Pass, 6,646 ft / 2,026 m (NPS) - **Season:** Ends open all year; alpine section about late June–third Monday of October - **Fees:** Park entrance pass (NPS) ## Route facts - **Route:** West Glacier (Apgar) → to St. Mary - **Length:** 50 miles (about 80 km); the Park Service gives about two hours without stoppingChecked 13 October 2026 · National Park Service, Glacier: Going-to-the-Sun Road general information - **Season window:** Lower ends open all year; the full road usually opens in late June or early July and the alpine section closes around the third Monday of OctoberChecked 13 October 2026 · National Park Service, Glacier: directions and road conditions - **Anchor point:** Logan Pass, 48.70° N, 113.72° W ## The short answer Going-to-the-Sun Road is the road across Glacier National Park in north-west Montana, from West Glacier on the west side to St. Mary on the east, over the Continental Divide at Logan Pass, 6,646 feet (2,026 m) up. The Park Service puts it at 50 miles and about two hours without stopping. The lower sections near the west entrance stay open all year; the full road over the pass opens only when plowing is finished, “late June at the earliest” on the park’s directions page and “typically… by early July” on its road page, and the alpine section usually closes around the third Monday of October, earlier if winter comes first. ## Why it's worth knowing Fifteen switchbacks or one. In 1924 the first Park Service director, Stephen Mather, rode up the west side of Logan Pass with two men who disagreed. The engineer George Goodwin had planned a climb up Logan Creek with fifteen switchbacks; the landscape architect Tom Vint wanted a route with a single one. Mather rode off without deciding, and two days later handed the survey to the Bureau of Public Roads, whose engineer Frank Kittredge laid out the present line, the Historic American Engineering Record’s history of the road says. It has one switchback west of the Divide, called the Loop, and a steady six percent climb from there to the pass, then the steepest grade recommended, because a car of the 1920s had to drop into second gear at seven. Built to look as if it grew there. Park Service landscape architects insisted that bridges, retaining walls and guard walls be built of native stone, most of it rock blasted from the mountainside beside them, and contractors were told to use many small blasts rather than a few large ones. Crews on the east side carried the rock of the East Side Tunnel out by hand. The first car crossed the whole road in the late autumn of 1932, and the park formally opened it at Logan Pass on 15 July 1933, with more than 4,000 people present and a ceremony of peace among the Blackfeet, Flathead and Kootenai tribes. Three men died building it. The road was paved end to end by 1952 and is one of six National Historic Landmarks in Glacier. A season set by the plows. The Park Service says no date can be given for the road to open over Logan Pass, because spring storms and avalanches can bury sections the crews have already cleared. Its own table of Logan Pass opening dates shows how wide the window is: between 2015 and 2022 the pass opened as early as 16 June (2016) and as late as 13 July (2020 and 2022). ## The field notes ### How long is it? The Park Service gives three lengths on three pages: 50 miles from West Glacier to St. Mary (its directions page, and its road page’s “full 50 miles”), 48.7 miles from Apgar Visitor Center to Divide Creek (its historic places page), and 51 miles in the 1990 engineering history. They measure from different points; this entry uses 50. ### Size limits Vehicles or combinations longer than 21 feet, including bumpers, or wider than 8 feet, including mirrors, may not drive between Avalanche Creek and Rising Sun. Vehicles over 10 feet tall may struggle west of Logan Pass because of rock overhangs. The speed limit is 40 mph on the lower road and 25 mph in the alpine section. There is no fuel inside the park. **A relic from the Going-to-the-Sun Road** The East Side Tunnel. A bore through the flank of Piegan Mountain, east of Logan Pass, cut by the Colonial Building Company in 1931 and 1932. No power equipment could reach the site, so the laborers carried the excavated rock out by hand, and the contractor advanced about five feet four inches a day. The Historic American Engineering Record’s history gives its length twice, as 405 feet and as 408 feet; it is the longer of the road’s two tunnels (the West Side Tunnel is 192 feet). The old tote road the builders used to reach it still shows on the mountainside about 200 feet above the road, and can be seen from the Logan Pass Visitor Center. ## Getting there How to get there. From the west, US Highway 2 reaches West Glacier, about 33 miles from Kalispell; Glacier Park International Airport, near Kalispell, is about 30 miles from the west entrance. From the east, the St. Mary entrance is reached by US 89 through Browning. Amtrak’s Empire Builder stops at West Glacier all year (all from the Park Service’s directions page). When to go. The whole road is usually open from early July to the third Monday of October, subject to weather. The park calls May to September its busiest period and July and August the busiest of all; the Logan Pass car park usually fills by sunrise. Outside the alpine season, the lower road near Lake McDonald stays open. What to arrange ahead. A park entrance pass. The park’s parking and shuttle rules for Logan Pass change from year to year. Safety. The park asks drivers to stay at least 25 yards from wildlife and 100 yards from bears and wolves, says water is the leading cause of death in Glacier, and warns that wildfires are common each summer. ## Common questions #### When does Going-to-the-Sun Road open? The lower ends of Going-to-the-Sun Road in Glacier National Park are open all year, but the alpine section over Logan Pass opens only when plowing is done. The Park Service says it is typically fully open by early July; between 2015 and 2022 Logan Pass opened between 16 June and 13 July. #### When does Going-to-the-Sun Road close? The alpine section of Going-to-the-Sun Road in Glacier National Park typically closes for the winter around the third Monday of October, or earlier in bad weather, while the lower ends stay open all year. #### How do the plows open Going-to-the-Sun Road? Slowly, and on the mountain’s schedule. The Park Service says no date can be given for Going-to-the-Sun Road to open over Logan Pass, because spring storms and avalanches can bury sections the crews have already cleared; between 2015 and 2022 the pass opened as early as 16 June and as late as 13 July. #### How long is Going-to-the-Sun Road? The Park Service gives Going-to-the-Sun Road as 50 miles from West Glacier to St. Mary, about two hours without stopping. Its historic places page gives 48.7 miles from Apgar Visitor Center to Divide Creek, and its 1990 engineering history gives 51. #### How high is Logan Pass on Going-to-the-Sun Road? Logan Pass, the highest point on Going-to-the-Sun Road, is 6,646 feet (2,026 m) above sea level, on the Continental Divide in Glacier National Park. It is 32 miles from the west entrance and 18 miles from the east entrance. #### What vehicles are not allowed on Going-to-the-Sun Road? Vehicles longer than 21 feet or wider than 8 feet, including mirrors, are prohibited on Going-to-the-Sun Road between Avalanche Creek and Rising Sun. The Park Service warns that vehicles over 10 feet tall may have difficulty west of Logan Pass because of rock overhangs. #### Do you pay to drive Going-to-the-Sun Road? Yes: driving Going-to-the-Sun Road needs a Glacier National Park entrance pass. #### When was Going-to-the-Sun Road built? Construction on Going-to-the-Sun Road began in 1919; visitors could reach Logan Pass about ten years later, and the first car crossed the whole road in late 1932. Glacier National Park formally opened it on 15 July 1933, and it was fully paved by 1952. What to pack: the Road trips kit, cold and high ## Related places The Icefields Parkwayabout 460 km away · both tagged scenic drive Banffabout 310 km away · same region Spotted Lakeabout 430 km away · same region Yellowstoneabout 530 km away · same region North Cascades National Parkabout 550 km away · same region ## Sources and notes Written and checked by SockMonkey.com · last reviewed 21 October 2026 - Fifteen switchbacks or one, and the opening of 15 July 1933: [The National Park Service (Going-to-the-Sun Road: An Engineering Feat, PDF)](https://www.nps.gov/glac/learn/news/upload/Going-to-the-Sun-Road-An-Engineering-Feat.pdf) - A National Historic Landmark road, built to fit the land: [The National Park Service](https://www.nps.gov/articles/890108.htm) - Open over the pass from late June at the earliest: [The National Park Service](https://www.nps.gov/glac/planyourvisit/directions.htm) - The park entrance pass: [The National Park Service](https://www.nps.gov/glac/planyourvisit/fees.htm) - Background: Wikipedia's article on the Going-to-the-Sun Road